First Floor, 14 Outram Street, West Perth WA 6005 Telephone: +61 8 9481 3322 PO Box 913 West Perth WA 6872 Facsimile: +61 8 9481 3330
th Date: 16 January 2006 To: Companies Announcements Office, ASX Electronic Lodgement: Number of pages: 2
ANNOUNCEMENT TO ASX
DRILLING RELEASE 6: EMILY#1 PEL-182, COOPER / EROMANGA BASIN S.A.
Eagle Bay Resources advises that the Emily-1 oil and gas exploration well is drilling ahead in the Lower Hutton Sandstone in 8 ½” hole. A fair oil show was noted in the Primary Objective at the Basal Birkhead/Top Hutton? at 1901.5m. This zone warrants testing at Emily-1.
Rain in the area has closed all roads and prevented the testing equipment arriving at the Emily-1 location in time to run a bottom hole drill stem test (DST) over this section as was originally planned. This zone will now be evaluated by wireline logs and a possible post logging straddle Drill Stem Test.
th The status of Emily-1 at 06:00 hrs (CST) on 16 January 2006 was: Location: PEL-182 Planned Total Depth: 2364 metres (TVD) Current Depth: 2027 metres - in Hutton SS. Operation: Drilling ahead in 8 ½” hole. th Spudded: 23:00 hrs 7 January 2006
Participants in the Emily-1 well are: Eagle Bay Resources (Operator) 37.6% Audax Resources Ltd 39.9% White Sands Petroleum Ltd 10.0% Australian Oil Company No2 P/L 12.5% Rig: Century Rig-18 Target Strata: Hutton SS Poolowanna SS Tinchoo SS
Yours sincerely
________________
TONY RECHNER DIRECTOR
EBR Price at posting:
0.0¢ Sentiment: None Disclosure: Not Held