Mt Isa Drilling Update Due to safety concerns caused by bush fires in close proximity to the drilling rig, the Company, at the drillers’ request, yesterday terminated the Mt Isa RC percussion drill programme. A total of 7 holes for 714 metres was drilled at the Lochness Prospect and 2 holes for 140 metres were drilled at the Miranda Prospect. With laboratories at full capacity over the seasonal break, the Company anticipates that assay results from the drill programme may not be available until February 2007.
MRX Price at posting:
0.0¢ Sentiment: Buy Disclosure: Not Held