KEY 0.00% 0.1¢ key petroleum limited

Dunnart 2 Drilling, page-19

  1. 169 Posts.
    lightbulb Created with Sketch. 4
    Slide 6 2 July says "drilling at the end of week" eg. 4/5 July. One week later still no news either about spud or reasons for delay. Why?
 
watchlist Created with Sketch. Add KEY (ASX) to my watchlist
(20min delay)
Last
0.1¢
Change
0.000(0.00%)
Mkt cap ! $2.262M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0
KEY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.