Thanks OGP for the nice overlay and Ash for your comments. Looks like Dukas is about 220km of sealed road and an unknown quantity of unsealed from Alice Springs, so logistics won't be simple for drilling. So 200km minimum from the existing pipelines to the north and 800 km across more difficult terrain physically and logistically to Moomba if we need to shift large volumes of gas post drilling. But wouldn't that be a great problem to have. Would be interested in whether others think that connecting to Moomba is the only realistic pipeline solution if we do hit it big, compared to upgrading of northern pipes and NGP (and would this be likely faster or slower to get built if negotiation required between all involved pipeline providers. Yes, I know its a pipe dream...
- Forums
- ASX - By Stock
- CTP
- Dukas-1 Timeframe Indication from Santos
Dukas-1 Timeframe Indication from Santos, page-13
Add CTP (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.0¢ |
Change
-0.002(3.85%) |
Mkt cap ! $37.74M |
Open | High | Low | Value | Volume |
5.2¢ | 5.3¢ | 5.0¢ | $73.94K | 1.456M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 1481 | 5.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.5¢ | 421806 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 55500 | 0.135 |
9 | 1167237 | 0.130 |
8 | 593133 | 0.125 |
19 | 902443 | 0.120 |
1 | 86000 | 0.115 |
Price($) | Vol. | No. |
---|---|---|
0.140 | 787079 | 9 |
0.145 | 1062465 | 10 |
0.150 | 344400 | 6 |
0.160 | 125481 | 8 |
0.165 | 497623 | 5 |
Last trade - 16.10pm 29/11/2024 (20 minute delay) ? |
CTP (ASX) Chart |