Thanks OGP. There it is: Tanami is contracted with ENI Blacktip/PWC.
Your useful map shows only a couple of prospects along the Tanami route. There must be more in bottom drawers ready for re-evaluation
I note Amaroo would only generate electricity, not installing an ammonia plant sucking great volumes of gas. WMC built the Phosphate Hill ammonia plant on site. IPL would be so much better placed if the PH ammonia plant was at eg Cairns, allowing all sorts of synergies. The Moranbah plant would have been built there allowing the export of ammonia, explosives, fertiliser and a range of nitrate products. It would by now be an awesome world-scale industrial facility with an ammonia plant the size of Waggaman and fewer LNG chillers would have been built. All IMHO.
Ash
- Forums
- ASX - By Stock
- CTP
- Dukas-1 Timeframe Indication from Santos
Dukas-1 Timeframe Indication from Santos, page-11
-
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add CTP (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.1¢ |
Change
-0.001(1.92%) |
Mkt cap ! $37.74M |
Open | High | Low | Value | Volume |
5.1¢ | 5.1¢ | 5.1¢ | $11.38K | 223.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 60226 | 5.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.2¢ | 140142 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 55500 | 0.135 |
9 | 1167237 | 0.130 |
8 | 593133 | 0.125 |
19 | 902443 | 0.120 |
1 | 86000 | 0.115 |
Price($) | Vol. | No. |
---|---|---|
0.140 | 787079 | 9 |
0.145 | 1062465 | 10 |
0.150 | 344400 | 6 |
0.160 | 125481 | 8 |
0.165 | 497623 | 5 |
Last trade - 15.12pm 27/11/2024 (20 minute delay) ? |
CTP (ASX) Chart |