I dont know but I dont think so as I think it requires a new well to be drilled at one of the sites that was not optimally chosen by the previous management I dont have my notes with me but I think its flax south. One of the points about the workover rig is whether it can release the deposits that are quite considerable missed or bypassed in the original drill The other is it pumps gas sometimes water in to force the oil to the surface and provide greater continuity and rate of flow If you look at the analysts report on the company website it may help I am not a geologist or a driller I have just lived in this company for the last three or four years so you need to check everything i say out particularly technical matters
ACN Price at posting:
29.0¢ Sentiment: Hold Disclosure: Held