STU 0.00% 94.0¢ stuart petroleum limited

re: + drilling of arwon--countdown + 29 September 2004Australian...

  1. 22,691 Posts.
    re: + drilling of arwon--countdown + 29 September 2004
    Australian Stock Exchange Limited
    Companies Announcement Office
    Electronic Lodgement System

    Dear Sir,
    ANNOUNCEMENT TO ASX
    DRILLING REPORT: ARWON # 1
    PEL 93, COOPER/EROMANGA BASIN, SA

    Stuart Petroleum advises that some faults with the BOP system were identified whilst pressure testing. These faults are being rectified and the system testing will
    be completed prior to running in the hole to commence drilling.

    The McKinlay formation is the first of the primary objectives at a prognosed depth of 1374 metres.
    The status of Arwon # 1 at 0600 hours (CST) on 29 September 2004 was:
    Location: PEL 93, 55km south-west of Moomba

    Planned Total Depth: 1930 metres
    Current depth: 790 metres
    Operations: Repairing BOP system
    Spud: 02.00hrs, 23 September 2004

    Participants in the Arwon Joint Venture are:
    Stuart Petroleum Limited (Operator) 88.8% (STU)
    Cooper Energy NL 11.2% (COE)
 
watchlist Created with Sketch. Add STU (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.