-
Share
26/09/04
13:03
Share
re: + + drilling of arwon--countdown + +
From STU:
"Operations: Drilling ahead in surface hole
Spud: 02.00hrs, 23 September 2004"
"The well is expected to reach its first target after 6 days of drilling and to be at total depth after 14 days of drilling"
________________
STU issues intermediary reports as well.
So for the time being it looks as the first target will be reached at 2 am on Tuesday, only some 30 hours away.
Tomorrow could be the last trading day before the first target is reached!
Gerry
-