well currently they are drilling 30-40 meters a day but once they reach the rock it will be increased to 45-50 meters a day.apparently they will work over the weekend except Sunday. (first hole is the trickiest, since the driller doesn't know the ground + water pressure from the lake which ads to the slow process)
So hopefully we should have something this week by Wednesday or Thursday(if rocks contain REE). M12A is the first to be drilled
i thing just Ree by itself will rocket this baby to 0.01-0.02 range depending on thickness of the rock and samples.
DMN Price at posting:
0.3¢ Sentiment: ST Buy Disclosure: Held