PES pepper residential securities trust no. 21

drilling commences plus aoe play, page-2

  1. 1,732 Posts.
    lightbulb Created with Sketch. 9
    thanks wiza, these points are enough to understand with what sleeping giant were dealing with.

    • areally extensive, correlatable coal seams (>100 km2)
    • Total net coal thickness in the order of 10 to 20 metres, with appropriate burial depth and coal maturity, for gas generation
    • the presence of gas proven by a methane gas explosion at the Duncan Colliery in 1977 (within 5 kilometres of the proposed drilling)
    • evidence of an active hydrologic system, suggesting increased potential for biogenic gas generation, and permeability
    • evidence of extensional structuring, for fracture enhancement and permeability
    In addition, there is the potential of existing commercial infrastructure:
    • the Tasmanian Gas Pipeline (TGP) and related gas distribution networks are in place and run directly through the tenement near some of the most prospective CSG areas
    • the Transend electricity transmission system runs throughout the tenement, with distribution arms extending within five kilometres of the richest coal areas of the Fingal-Dalmayne region, Pure’s first drilling target.
    Pure Energy’s objective is to demonstrate both the distribution and economic viability of CSG production in the Tasmania Basin.
 
watchlist Created with Sketch. Add PES (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.