Exploration Office Ground Level 11A Croydon Road KESWICK SA 5035 Tel: +61 8 8351 3388 Fax: +61 8 8375 3999 InterMet Resources Limited [email protected] [email protected] ACN 112 291 960 www.intermetresources.com.au Registered Office Level 41 Australia Square 264-278 George Street SYDNEY NSW 2000 Tel: +61 2 8221 0404 Fax: +61 2 8221 0407 Friday, 17 November 2006 DRILLING COMMENCES AT LAKE GILLES GRAVITY TARGETS InterMet Resources Limited (ASX:ITT) is pleased to announce that drilling commenced today at its flagship Lake Gilles Project. Red Dam hole RD-DD2 is the first in a planned six hole program aimed at targets generated from detailed gravity data. This hole will be drilled to an estimated depth of 600m with the top of the gravity feature modeled at 360m deep. New gravity data showing location of three prospects on InterMet’s Lake Gilles Project The information in this report that relates to Exploration Results is based on information compiled by Mr. Gary Ferris, who is a Member of The Australasian Institute of Mining and Metallurgy. Mr. Ferris is the Managing Director of InterMet Resources and has sufficient relevant experience to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Gary Ferris consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. For further information contact: Mr Gary Ferris Managing Director InterMet Resources Tel: +61 8 8351 3381 Mob: 0423 259 488
ITT Price at posting:
0.0¢ Sentiment: Buy Disclosure: Held