Hi guys. I am finally back on HC.
I will not be spending a lot of time on HC threads as I am also posting on other social media platforms and have other business duties.
I just want to touch to a few points for now;
GPP will be drilling through the wet season and complete 15 to 20 holes as stated on the previous anns.
The excavator is owned by GPP. It will be used to construct new dril pads & new roads, to pull the skid drill rig to the new drill pads, to dig new trenches in other prospects (Banakaru & East Camp), etc.
Here is the exact location of Drill hole TDH-P03 on Google Earth and Assay results map. (The Co-Ordinates 234513E and 648906N)
It is obvious from the planned down hole length of 140m that they are trying to intersect more than one pegmatites at once IMO.