Rig was delayed a bit, I think they are about a month behind previous plans. Might explain weakness - the market punishes delays as most traders have had bad experiences with the specs that continually miss time targets for drilling, resource estimates, PFS timing etc and tend to dump at the first sign of a "non-performer"
Can't really read anything into this delay as they have no control over manufacturing delays.
- Forums
- ASX - By Stock
- drill rig with apache
Rig was delayed a bit, I think they are about a month behind...
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TDO (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.4¢ |
Change
-0.001(1.05%) |
Mkt cap ! $23.20M |
Open | High | Low | Value | Volume |
9.5¢ | 9.5¢ | 9.1¢ | $5.351K | 56.33K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 300000 | 9.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.5¢ | 384001 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 5356 | 0.110 |
3 | 295873 | 0.105 |
3 | 454409 | 0.100 |
2 | 189731 | 0.095 |
1 | 50000 | 0.090 |
Price($) | Vol. | No. |
---|---|---|
0.120 | 100000 | 1 |
0.130 | 48728 | 1 |
0.140 | 260375 | 2 |
0.145 | 70000 | 2 |
0.150 | 151165 | 2 |
Last trade - 15.31pm 22/11/2024 (20 minute delay) ? |
Featured News
TDO (ASX) Chart |
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Andy Udell, CCO
Andy Udell
CCO
SPONSORED BY The Market Online