It seems you are relying solely on the Latin Gold Heap leach (HL) story coming through quickly to save IGS - isn't going to happen !!
Firstly, no significant nor meaningful metallurgy done on oxide material to demonstrate profitability of HL. Secondly, the time frame for permitting, construction and costs is out some 12 months (easy)not including any costs blowout.
The Plumbridge is a crap deal destroying value not adding it, there was a much easier way that would have benefited IGS SH (which should be a priority), that was to IPO Latin Gold.
What a complete F&%K UP !!
IGS Price at posting:
0.3¢ Sentiment: None Disclosure: Not Held