TNP 0.00% 2.5¢ triple energy limited

Varuka they,ve been preparing the site for the last week so that...

  1. 5,342 Posts.
    lightbulb Created with Sketch. 353
    Varuka they,ve been preparing the site for the last week so that the rig can mobilise onto the site following very wet weather. It's not as easy as just backing a truck onto the site and putting a drill down. Read up a little on what is involved in this type of drilling. It's quite a large operation involving numerous pieces of equipment and will take days to set up and safety test before they can even consider spudding in for drilling. SAYETY FIRST is the correct approach!
 
watchlist Created with Sketch. Add TNP (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.