CUX 0.00% 0.6¢ crossland strategic metals ltd

cux's lower cost per tonne of ore., page-11

  1. 28,706 Posts.
    lightbulb Created with Sketch. 237
    Therefore, to mine and produce a mine gate ore of 2.1% from a .03% ore would be in the order of $280/tonne

    i find this ambiguous because what seems to be occuring here is increasing the concentration of REE

    how does it change the amount of REE in the concentrate?

    whether the REE grade is concentrated to 2% or 12% in the wet plant process, the amount of REE in the concentrate does not change

    in 1 tonne of ore, there is 0.29 kg of REE metal

    at 68% wet plant recovery, in 1 tonne of ore, there is 0.2 kg of REE metal

    if wet plant creates a 2% concentrate or a 12% concentrate, there still remains only 0.2 kg of REE in that concentrate produced from 1 tonne of ore (dirt)

    the cost of extracting 0.2kg of REE metal at the wet processing stage is $4 or $20/kg
 
watchlist Created with Sketch. Add CUX (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.