Interesting the Uni says only install it on one or two walls
"At the same time, the overall architectural design of buildings should ideally account for the site-specific and climate specific energy-harvesting performance optimization of wall-mounted PV arrays or windows, for example by installing these systems on one or two of the most suitable building walls only"
but CPVs model had it on three. Sounds like CPV were desperate to get their number as high as possible perhaps??? Hmm.
- Forums
- ASX - By Stock
- CPV Chart Thread
Interesting the Uni says only install it on one or two walls "At...
-
- There are more pages in this discussion • 48 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add CPV (ASX) to my watchlist
(20min delay)
|
|||||
Last
24.5¢ |
Change
-0.010(3.92%) |
Mkt cap ! $98.52M |
Open | High | Low | Value | Volume |
25.5¢ | 26.0¢ | 24.0¢ | $78.15K | 314.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 47980 | 24.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
24.5¢ | 21744 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 11957 | 0.420 |
2 | 20921 | 0.415 |
4 | 123661 | 0.410 |
1 | 2471 | 0.405 |
8 | 40055 | 0.400 |
Price($) | Vol. | No. |
---|---|---|
0.435 | 16870 | 2 |
0.440 | 39572 | 2 |
0.450 | 6157 | 2 |
0.460 | 31026 | 5 |
0.470 | 21978 | 1 |
Last trade - 13.38pm 15/11/2024 (20 minute delay) ? |
CPV (ASX) Chart |