The Numbers based on other installations with similar power is 130 watts per day per sqm as a yearly average.
The Payoff rates are on average 4 years with the next 20 plus years collecting free power.
Glass is a massive Industry World Wide, and many areas need extra power because the Grid isnt strong enough to supply the growing needs.
A first rate example of that was the Cricket in Brisbane last night, Stopping the Game because the power went out.
The need for extra power supply and extra Power storage as backup is massive.
- Forums
- ASX - By Stock
- CPV Chart Thread
The Numbers based on other installations with similar power is...
-
-
- There are more pages in this discussion • 591 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add CPV (ASX) to my watchlist
(20min delay)
|
|||||
Last
24.0¢ |
Change
-0.015(5.88%) |
Mkt cap ! $98.52M |
Open | High | Low | Value | Volume |
25.5¢ | 26.0¢ | 24.0¢ | $120.7K | 488.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
8 | 45490 | 24.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
25.0¢ | 6578 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 11957 | 0.420 |
2 | 20921 | 0.415 |
4 | 123661 | 0.410 |
1 | 2471 | 0.405 |
8 | 40055 | 0.400 |
Price($) | Vol. | No. |
---|---|---|
0.435 | 16870 | 2 |
0.440 | 39572 | 2 |
0.450 | 6157 | 2 |
0.460 | 31026 | 5 |
0.470 | 21978 | 1 |
Last trade - 16.10pm 15/11/2024 (20 minute delay) ? |
CPV (ASX) Chart |