Yeah i wondered this myself, and figured around $3.5million - $4million. This was based on Armour stating that the $6million GAP Funding grant would cover approx. 40% of the costs of 4 production wells. So $6million / 40% = $15million / 4 wells = $3.75million per well. They did also state that the costs included connection to the infrastructure as well.