That may well be what's on the slide, but David Maxwell's address which accompanies it (i.e. same file) says what I quoted. There is no Henry development well or Manta-3 in 240 days starting from Feb '18. (Slide 12 says 2019/2020 to drill Manta-3). COE doesn't have the capital for either of them.
Be happy with just the Workover and getting the 2 Sole wells drilled and completed without any setbacks. That's the operational risk that concerns me.
Now that you mention flow testing, what is the thought on what rates would be expected, what would be outstanding and what would be a concern?
- Forums
- ASX - By Stock
- Cooper Energy boss to use power wisely
That may well be what's on the slide, but David Maxwell's...
-
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add COE (ASX) to my watchlist
(20min delay)
|
|||||
Last
17.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $488.4M |
Open | High | Low | Value | Volume |
16.5¢ | 17.0¢ | 16.5¢ | $173.7K | 1.025M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
24 | 854516 | 16.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
17.0¢ | 51212 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 97807 | 0.495 |
9 | 340433 | 0.490 |
6 | 93000 | 0.485 |
16 | 586345 | 0.480 |
5 | 523974 | 0.475 |
Price($) | Vol. | No. |
---|---|---|
0.500 | 48427 | 3 |
0.505 | 358523 | 6 |
0.510 | 124819 | 4 |
0.515 | 133235 | 7 |
0.520 | 912777 | 15 |
Last trade - 16.10pm 11/11/2024 (20 minute delay) ? |
COE (ASX) Chart |
Day chart unavailable