PEL-182 COOPER BASIN S.A. EBR 37.6%
The contract for Century Rig-3 to drill Sarahlyn-1 and Vanessa-1 in PEL-182 (with an option
for two further wells) has been signed and the rig has been mobilised. The camp is on
location, the rig is two-thirds on location and is in the process of being set up.
The contractor expects to spud the first well Sarahlyn-1 Saturday 14 April 2007.
- Forums
- ASX - By Stock
- cooper basin: 1st well 14th april
PEL-182 COOPER BASIN S.A. EBR 37.6%The contract for Century...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EBR (ASX) to my watchlist
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Andy Udell, CCO
Andy Udell
CCO
SPONSORED BY The Market Online