EBR 0.25% 98.8¢ ebr systems inc.

cooper basin: 1st well 14th april, page-2

  1. 1,350 Posts.
    lightbulb Created with Sketch. 1
    PEL-182 COOPER BASIN S.A. EBR 37.6%

    The contract for Century Rig-3 to drill Sarahlyn-1 and Vanessa-1 in PEL-182 (with an option
    for two further wells) has been signed and the rig has been mobilised. The camp is on
    location, the rig is two-thirds on location and is in the process of being set up.

    The contractor expects to spud the first well Sarahlyn-1 Saturday 14 April 2007.

 
watchlist Created with Sketch. Add EBR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.