Hydrotech has been awarded to install the MPS system into Chongqing-Chendu Expressway Tunnel.
The contract will be to install across an area of some 108,000 sq meters.
The average price for a square meter amongst the submission program was AUD$24 per sq meter.
If AUD $24 is obtained that = approx $2.5 mill.
Lets hope this is the start of better things to come.