A quick look at DU-EL's client list tells you that OBL are one of them.
DU-EL also has a larger rig in manufacturing that will be capable of drililng to 4,000m with 5" drill pipe. This 250ton super single will be available in Australia mid 2014.
http://du-el.com/land-rigs.html
This rig is supposed to deliver 30 percent savings mainly due to the telescopic mast,it only needs five semi trailers to shift it.
To me this means 30 percent more money in the ground drilling.
The above rig is more than capable of drilling the holes as per the last presentation.
Raider
- Forums
- ASX - By Stock
- EMP
- connecting the dots
connecting the dots, page-9
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add EMP (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.5¢ |
Change
0.004(19.1%) |
Mkt cap ! $3.312M |
Open | High | Low | Value | Volume |
2.4¢ | 2.5¢ | 2.4¢ | $62.54K | 2.524M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 116309 | 2.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.5¢ | 67452 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 683870 | 0.003 |
19 | 25757561 | 0.002 |
15 | 18215015 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 11012939 | 22 |
0.005 | 5224950 | 6 |
0.006 | 9926666 | 4 |
0.007 | 7845449 | 7 |
0.008 | 3646766 | 2 |
Last trade - 14.18pm 08/11/2024 (20 minute delay) ? |
EMP (ASX) Chart |