AQC 2.5 Billion tonnes of coal in the Hunter Valley. Ash content...

  1. 830 Posts.
    AQC

    2.5 Billion tonnes of coal in the Hunter Valley.
    Ash content is quite high as well, around 20% but washable down to 10%.
    Infrastructure in place ready to mine.
    Only problem is it needs to be an open cut mine for it to be economically viable.
    Buyer beware, this is a Nathan Tinkler project.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.