Coal Juniors - Mid Sizes, page-18

  1. 830 Posts.
    AQC

    2.5 Billion tonnes of coal in the Hunter Valley.
    Ash content is quite high as well, around 20% but washable down to 10%.
    Infrastructure in place ready to mine.
    Only problem is it needs to be an open cut mine for it to be economically viable.
    Buyer beware, this is a Nathan Tinkler project.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.