CBD 0.00% 1.1¢ cbd energy limited

More holes in your figures.Do the sliver panels require the...

  1. 2,375 Posts.
    More holes in your figures.

    Do the sliver panels require the following items to be installed on a roof?

    Inverter
    Mounting system
    BOS
    Installing cost

    The above equals above 2 dollars per watt.
    Freight and trucking comes to around 10cents per watt

    The 1.50 per watt refers to the thin film market. Some Manufactuers are hitting below 1.00 per watt cost. If sliver wants market share for ground mount projects then they have to hit close to these prices.

    Again if your making claims that sliver cells will cut cost in half, please provide facts to back up your claims. The less silicon logic does not hold water. As the process to produce a regular crystalline wafer to panel is different vs producing a sliver wafer to panel.

    Once your able to provide factual cost involved to produce a sliver panel, then we can see if your claims are true. I just don't see how the processing cost of stringing 20 times more cells in the same footprint would be cheaper to make.
 
watchlist Created with Sketch. Add CBD (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.