MPJ 0.00% 0.0¢ mining projects group limited

Its a weekly chart, not daily. so the timeframe is approx two...

  1. 306 Posts.
    Its a weekly chart, not daily.
    so the timeframe is approx two weeks.
    therefore I disagree, 1.8c is achievable.
    for example, if an adequate amount of Nickel was reported from drilling results and or a hand held XRF onsite.. if I recall correctly MPJs 1st reported XRF intercept was reported from onsite, what did the SP do that day?
    Maybe you were not a holder at that point in time.
    What was that 2.3c spike on my chart?
    btw..we would not be talking excessive metres of Nickel to get the sp to 1.8c.
    having said that we wouldn't mind......$$.....and metres of nickel
    heck 5.0c could be easily achieved with good results reported.
    DYOR...
 
watchlist Created with Sketch. Add MPJ (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.