BDM 4.76% 10.0¢ burgundy diamond mines limited

Whilst Palta does its thing and we await news the next gig for...

  1. 7,638 Posts.
    lightbulb Created with Sketch. 15
    Whilst Palta does its thing and we await news the next gig for Cott is drilling of the Chamois Oil Field, discovered in 2000.
    Going from an old CMT presentation...
    Chamois prospects independently verified at 10mmbbl
    Cotts share (12.3%)
    Cott estimates upside to 20mmbbl, Cott share 1.2-2.4mmbbl
    Hydra as operator

    I understand the target sits in around 40m of water with TD arond 1000m, should take around 10 days to drill.
    Chamois appears to be a fairly low risk drill that has good potential to achieve early cash flow.
    I expect they will announce a firm timetable for drilling sometime in the next few weeks
 
watchlist Created with Sketch. Add BDM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.