It is very sad to see the cap raising price dropping from 4c last time to 3.1c.
Someone may expect the positive results from Dome 5. However, I just wonder with all findings below 310 metres and seam ranging from 0.85 metres to 3 metres thick only, is it economically viable to develop Dome 5 tenement?
If Dome 5 results were negative, there would be nothing left for UXA in short to mid term!