MRX 0.00% 0.7¢ matrix metals limited

33% irr re: white range project pre-feas study buy BFS Economic...

  1. 570 Posts.
    lightbulb Created with Sketch. 1
    33% irr re: white range project pre-feas study buy BFS Economic Analysis Results

    Copper Cathode Production per year (Tonnes) 15,000
    Project Life (Years) 6.2
    USD Copper Price Flat (Per lb) $1.40
    USD/AUD Exchange Rate Flat(Per lb) $0.75
    A$ Copper Price Flat (Per lb) A$1.87

    Total Net Profit A$74M
    NPV @ 5% Discount A$53M
    IRR 33%
    Pre Production Capital Cost A$39M
    Operating Cost (Per lb AUD) A$1.16
    Capital Cost (Per lb AUD) A$0.30
    Total Cost (Per lb AUD) A$1.46
 
watchlist Created with Sketch. Add MRX (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.