Tullow Oil trading update released.
No change to the last update regarding the Coronie block.
Onshore Suriname, the five-well drilling programme on the Coronie licence (Tullow 40%) is scheduled to commence in Q1 2011 and the two-well programme on the Uitkijk licence (Tullow 36.5%) is scheduled for Q2 2011.
Dibbler #1 should by now be about halfway to the target depth.