So then we instigate a pad drill program into the most most productive bit of the REM with say 6 laterals 1500 m long, that 9000m of well surface area at optimal width.
9000/350x2mmcfd = 51mmcfd FROM ONE WELL.
Not sure it actually works like that but it was fun to do and should the frac test later this month produce flow rates anything like 2mmcfd Im thinking it will be a good result
ADE Price at posting:
14.0¢ Sentiment: Buy Disclosure: Held