"Would it work with 0.67%Ni 0.1% Co AUZ sconi ore? well the AUZ BFS says that HPAL is uneconomic for that short of an interest free loan"
Sorry have you read their BFS. It's very much an economically viable project. Of Base Case proportion, and only used a margin of their total reserve of 89mt they used 33mt base case with an 18yr LOM. And the BFS shows it to be economical. Using standard 50+yr HPAl processing tech.
JD.
PM1 Price at posting:
1.5¢ Sentiment: None Disclosure: Not Held