PM1 and QPM have been very clear that seek to take advantage of this relatively new technology and method.
The pilot plant works will with 1.4%Ni 0.14% Co. Which is less that the grade of the NC ore.
Would it work with 0.67%Ni 0.1% Co AUZ sconi ore? well the AUZ BFS says that HPAL is uneconomic for that short of an interest free loan.