NWH 0.26% $3.92 nrw holdings limited

If this were significant news from the perspective of NWH's...

  1. 2,320 Posts.
    lightbulb Created with Sketch. 170
    If this were significant news from the perspective of NWH's revenue deviating from the $1,100 million guidance, there would have been a new Announcement to that effect. The news has been on the public record since 5 February, perhaps earlier in respect to Grace – see https://www.forrestfieldairportlink.wa.gov.au/tunnelling/tunnel-boring-machines.

    . . . . . . . . . . . Metres . . Tunnel rings
    . . . . . . . . . tunnelled . . . installed . . Status
    TBM Grace .. 3944m . . . . . . 2363 . . . Stopped underneath car park,
    . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . corner Snook & Taplin roads
    . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . for screw conveyor repairs.
    TBM Sandy .. 3839m . . . . . . 2297 . . Stopped underneath Woods Rd
    . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . for screw conveyor repairs.

    TBMs stopped due to mechanical issue

    On Friday January 18, workers operating TBM Grace reported a potential mechanical issue with the machine. Since then tunnelling experts from SI-NRW and German TBM manufacturer Herrenknecht have been able to identify and isolate the issue – damage to the screw conveyor, which moves excavated material away from the front of the TBM – and repair works have started.

    Repairs include replacing a 3m section of the 16m-long screw conveyor and repairing hairline cracks that have a been identified. At this stage, it is estimated repair works will be completed in March. TBM Grace will remain stationary during this time.

    On Monday February 4, TBM Sandy was stopped as a precaution so that the machine’s screw conveyor could be proactively inspected for similar faults. Early visual inspections have confirmed the presence of hairline cracks. A full damage assessment will now take place and the machine will remain stopped while assessment and repairs are completed.

    The mechanical issue does not pose a risk to worker safety, and no ground disturbance issues are expected.

    Two new screw conveyors will be manufactured by Herrenknecht and will be installed while the TBMs are at Redcliffe Station later this year.
    Last edited by Pioupiou: 15/02/19
 
watchlist Created with Sketch. Add NWH (ASX) to my watchlist
(20min delay)
Last
$3.92
Change
0.010(0.26%)
Mkt cap ! $1.574B
Open High Low Value Volume
$3.97 $3.97 $3.86 $4.473M 1.141M

Buyers (Bids)

No. Vol. Price($)
5 11521 $3.91
 

Sellers (Offers)

Price($) Vol. No.
$3.93 14574 3
View Market Depth
Last trade - 16.10pm 21/11/2024 (20 minute delay) ?
NWH (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.