TOU 0.00% 1.7¢ tlou energy limited

Botswana $495m - power extended to Northwest, page-2

  1. 291 Posts.
    lightbulb Created with Sketch. 7
    Great news!

    As picked up by Amurray; http://allafrica.com/stories/201801240234.html
    Construction began monday.

    “The NWTGC phase I will see the construction of a 400 kv backbone transmission line from Morupule B to Maun via Orapa, two 400kv substations and 220kv / 132kv lines and substations connecting Toteng, Ghanzi, Shakawe and Gumare to the 400kv line. Phase II will see the extension of the 400kv grid from Phokoje (Selebi-Phikwe) to Pandamatenga via Dukwi and a 220kv line to Kasane/Kazungula.”

    Phase 1 passes right past Tlou and Serowe.
 
watchlist Created with Sketch. Add TOU (ASX) to my watchlist
(20min delay)
Last
1.7¢
Change
0.000(0.00%)
Mkt cap ! $38.58M
Open High Low Value Volume
1.7¢ 1.7¢ 1.7¢ $612 35.99K

Buyers (Bids)

No. Vol. Price($)
5 1177477 1.6¢
 

Sellers (Offers)

Price($) Vol. No.
1.8¢ 238018 1
View Market Depth
Last trade - 11.57am 22/11/2024 (20 minute delay) ?
TOU (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.