SAU 4.35% 8.8¢ southern gold limited

mce-anchorKeywordmce-anchorCompanymce-anchorEPIC/TIDMmce-anchorSE...

  1. 53 Posts.
    Column 1
    0
    • mce-anchorKeyword
    • mce-anchorCompany
    • mce-anchorEPIC/TIDM
    • mce-anchorSEDOL/ISIN
    • mce-anchorNews
    Bluebird Merchant (BMV)mce-anchorAdd to Alerts list
    Column 1
    0 Print Mail a friend
    Tuesday 09 January, 2018 Bluebird MerchantHigh Grade Gold Grab Samples at GubongRNS Number : 2759BBluebird Merchant Ventures Limited09 January 2018 9 January 2018 Bluebird Merchant Ventures Ltd(the "Company" or "Bluebird")High Grade Gold Grab Samples at GubongBluebird Merchant Ventures (EPIC: BMV), the Asian focused resource development group is pleased to announce the results of preliminary 'grab samples' from the Gubong gold mine.Highlights· Encouraging assay results indicating that a significant amount of gold remains unmined at Gubong· 10 of 15 samples returned gold grades of over 1 g/t with 3 returning grades of 10 g/t and over· 12 of the 15 samples returned silver grades of 10 g/t and over· The grades indicate ore body structureThe samples were taken after engineers gained entry into the old workings at Adit 4 and from spillage in Decline Shaft Number 2. All the samples were taken from fines or broken ore lying on the ground. The results, as tabulated below, represent the fact that the old workings have significant amounts of gold which were left in the form of broken ore that was never taken to the process plant.Of upmost significance are the spillage samples taken in the shaft (KRA200011 - KRA200015). They imply that the ballast under the tracks of each level used to transport ore for several years is likely to carry gold - yet another source of early cheap production. The Gubong mine could potentially have 30 to 40 kilometres of railed tunnels that was used to transport gold.The Gubong mine is an orogenic deposit. Orogenic ore bodies typically have a depth of 2 kilometres. The Gubong mine currently has a depth of 500 metres. Historical drill results that were previously announced on 3 October 2017 indicate that the structure continues below the 500 metre level so the mine has significant upside potential.
    Column 1 Column 2 Column 3 Column 4 Column 5 Column 6 Column 7 Column 8 Column 9 Column 10 Column 11 Column 12 Column 13 Column 14 Column 15 Column 16 Column 17 Column 18 Column 19 Column 20 Column 21 Column 22 Column 23 Column 24 Column 25 Column 26 Column 27 Column 28 Column 29 Column 30 Column 31 Column 32 Column 33 Column 34 Column 35 Column 36 Column 37 Column 38 Column 39 Column 40 Column 41 Column 42 Column 43 Column 44 Column 45 Column 46 Column 47 Column 48 Column 49 Column 50 Column 51 Column 52 Column 53 Column 54 Column 55 Column 56
    0 Sample Number
    Location
    Date
    Sample Type
    Gold (g/t)
    Silver (g/t)
    KRA200006
    Adit 4
    18-10-2017
    GRAB
    1.00
    17.00
    KRA200007
    Adit 4
    18-10-2017
    GRAB
    21.00
    17.00
    KRA200008
    Adit 4
    18-10-2017
    GRAB
    7.00
    10.00
    KRA200009
    Adit 4
    18-10-2017
    GRAB
    7.00
    10.00
    KRA200010
    Adit 4
    18-10-2017
    GRAB
    1.3
    40.00
    KRA200011
    Decline 2
    18-10-2017
    GRAB
    6.7
    20.00
    KRA200012
    Decline 2
    18-10-2017
    GRAB
    13.3
    17.00
    KRA200013
    Decline 2
    18-10-2017
    GRAB
    10.0
    13.00
    KRA200014
    Decline 2
    18-10-2017
    GRAB
    3.1
    8.00
    KRA200015
    Decline 2
    18-10-2017
    GRAB
    1.2
    12.00
    Charles Barclay, COO, commented:"The gold price was around USD 40/oz when the mine closed. These results demonstrate that many areas of the mine were undoubtedly left unmined due to what was, at the time, unpayable grades. Furthermore, the potential for processing cheap payable tonnes in a short space of time is good. Our initial goal is to delineate sufficient ore to support the first three years of profitable mining within the upper regions of the mine growing to an annual production of 30,000 oz. Thereafter we will continually scale up annual production as we access the lower regions of the mine." Colin Patterson, CEO, commented:"The sheer size of the Gubong gold mine becomes more evident as we make progress. The fact that such good results have been seen from the first few hundred metres of the mine is very encouraging. The mine has over 120 kilometres of underground tunnels and was South Korea's second largest gold mine. I am confident that the Gubong project will deliver significant value to shareholders." THIS ANNOUNCEMENT CONTAINS INSIDE INFORMATION FOR THE PURPOSES OF ARTICLE 7 OF THE MARKET ABUSE REGULATION EU 596/2014 ("MAR") https://www.investegate.co.uk/blueb...amples-at-gubong/201801090700022759B/[/table]
 
watchlist Created with Sketch. Add SAU (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.