-
Share
3,469 Posts.
1
17/02/11
10:20
Share
Hi You All
Data From SONITE
"02/14/2011 05 10514 DRLD T/ 10506'; POH; TSTD BOPS 2/8/11; LOGGED; RAN 11-7/8" CSG T/ 10506' & CMT W/ 2405 SXS; TSTD BOPS 2/12/11; DRLD T/ 10514';
02/07/2011 05 10425 DRLG"
Between 02/07/2011 and 02/14/2011 they drilled 81 ft
10425 to 10506
The rest of the time they spent Pulling out of Hole, logging,Casing,Cementing,Testing - Close to 7 days
So you can expect another week of the same when the next casing point is reached - and possibly another before TD.
Which sounds like very close to 50 days from SPUD to TD
So the 600 ft per day from now on, calculation, is iffy.
More like 300
My guesstimate for BIG NEWS from SONITE Report is now
Tue 8 Mar - all being well.(that's 19 days from now)
and it won't all be over by then,but we should KNOW WOT IS.
NOT ADVICE JUST MHO
CHEERS
-