Share
8,701 Posts.
lightbulb Created with Sketch. 17
clock Created with Sketch.
05/03/13
16:57
Share
jtucker, $5m maybe from this one. It stated the study should be completed in March 2013 & the project is still within budget. http://www.breakbulk.com/cargo-by-region/asia/china/chinese-epc-bid-for-papua-new-guinea-mine-within-target/ The NPAT $1.5m that was $4m below plan for the half is because of this, but it doesn't got cancelled, it just got delayed (open-ended). It's worth $50m, so NPBT around $4m (just about right) http://imagesignal.comsec.com.au/docserver/01237129.pdf?fileid=01237129&datedir=20111102&edt=MjAxMy0wMy0wNSsxNjozNzo0MSsxMjArMCtjb21zZWMrcmVkaXJlY3QrL2ltYWdlc2lnbmFsL2Vycm9ycGFnZXMvUERGVGltZW91dC5odG1sKy9pbWFnZXNpZ25hbC9lcnJvcnBhZ2VzL3BkZmRlbGF5ZWQuanNw