AZG 0.00% 3.6¢ allmine group limited

This is the main cause of delayed iron ore project exposure...

  1. 8,701 Posts.
    lightbulb Created with Sketch. 17
    This is the main cause of delayed iron ore project exposure during 1st half (Sino Project), resulted in missed guidance.

    http://www.globaltimes.cn/content/759519.shtml

    The 2nd half of 2013 should be ok as other non-sino projects are rolling.
 
watchlist Created with Sketch. Add AZG (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.