This is the main cause of delayed iron ore project exposure during 1st half (Sino Project), resulted in missed guidance. http://www.globaltimes.cn/content/759519.shtmlThe 2nd half of 2013 should be ok as other non-sino projects are rolling.
History-making uranium sample grades and an imminent drill run. Infini Resources is poised to transform in 2025
ACW This biotech stock raised $11M in a risk-off environment. Its Alzheimer's drug could change the game