AOE 0.00% $4.68 arrow energy limited

bg now planning 8.3 mtpa lng for curtis island, page-7

  1. 11,543 Posts.
    lightbulb Created with Sketch. 273
    Scottdash,

    With LNG you basically start off with a conceptual size, then generally optimise the flowsheet design around site rated performance of key items of equipment, mostly importantly the gas turbine drivers.

    If you don't do that someone else will debottleneck it later on and make you look pretty dumb, and careless with some big money.

    EL
 
watchlist Created with Sketch. Add AOE (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.