im not sure where you get your optimism from. it may have been announced in july, but i wouldnt expect the pilot installation to be completed before september and then another 3 months from then.
remember this: Contract Award On behalf of Chongqing-Chengdu Expressway Company
Hydrotech has signed an installation contract to install the MPS System into the Zhongliangshan Mountain tunnel on the Chongqing-Chengdu Expressway, Chongqing Province in China. This project is in two phases; Phase 1 is a fully paid scientific study, which involves Hydrotech China installing our system in a controlled area of tunnel 1. Phase two is the continuation of the installation once the humidity is at the contracted target. The MPS system should reach the target humidity within 4 weeks from commissioning.
what happened to the 4 week period of assessment? was it accepted or not?