HTI 0.00% 0.1¢ hydrotech international limited

better, page-8

  1. TBE
    3,734 Posts.
    im not sure where you get your optimism from.
    it may have been announced in july, but i wouldnt expect the pilot installation to be completed before september and then another 3 months from then.


    remember this:
    Contract Award On behalf of Chongqing-Chengdu Expressway Company

    Hydrotech has signed an installation contract to install the MPS System into the
    Zhongliangshan Mountain tunnel on the Chongqing-Chengdu Expressway,
    Chongqing Province in China. This project is in two phases; Phase 1 is a fully
    paid scientific study, which involves Hydrotech China installing our system in a
    controlled area of tunnel 1. Phase two is the continuation of the installation once
    the humidity is at the contracted target. The MPS system should reach the target
    humidity within 4 weeks from commissioning.


    what happened to the 4 week period of assessment?
    was it accepted or not?
 
watchlist Created with Sketch. Add HTI (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.