Hi, check out BSM latest company presentations, many key...

  1. 1,904 Posts.
    lightbulb Created with Sketch. 249
    Hi, check out BSM latest company presentations, many key operational quoted figures (6000tpa stage1 and 20.000tpa stage2, 94%+ purity, more than half the production as large flakes, 70% recovery rates targets, less than 500$ per tonne operating costs...etc). IMO they will prepare a detailed feasibility study for stage2 expansion. Stage1 was just low capex refurbishment (5 million$).
    Last edited by DoctorFouad: 23/04/18
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.