GRB 8.16% 5.3¢ gage roads brewing co limited

The time for setup depends heavily on the money the installer...

  1. 157 Posts.
    lightbulb Created with Sketch. 4
    The time for setup depends heavily on the money the installer can spend. Also on how much is pre-installed (i.e. coolrool, bar-setup or storage). I once worked for a party, that set up the Energy Australia Stadium in Newcastle for draughtbeer. It took about four weeks in this existing venue, to get the beer into cups. Success was 100 kegs in the first homegame of the Knights and declined from there. Even with the Soccer events, altogether say 10 to 15 homegames for NRL and bugger all beer for Soccer, there was in my opinion a loss involved for the operator. I like GRB and sincerely hope, this one is successful. In Pivo Veritas!!
 
watchlist Created with Sketch. Add GRB (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.