AZS 2.27% 32.3¢ azure minerals limited

Meantime Tony continues to tick all the boxes.......... The...

  1. 888 Posts.
    lightbulb Created with Sketch. 17
    Meantime Tony continues to tick all the boxes..........

    The timeline for key elements of the PEA that remain outstanding is as follows:
    • Marketing studies - May
    • Mineral resource estimate - June
    • Ore and concentrate transport and logistics studies - July
    • Mining study - July
    • Processing study, including finalising process plant design and scale - August
    • Capital and operating cost estimate and financial analysis – September
    • Reporting of final PEA results - September
 
watchlist Created with Sketch. Add AZS (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.