CPV 5.88% 24.0¢ clearvue technologies limited

"As a first goal, architects can take the responsibility to...

  1. 11,120 Posts.
    lightbulb Created with Sketch. 108
    "As a first goal, architects can take the responsibility to educate themselves. Firms should be looking beyond LEED to understand deeper approaches to sustainability. Passive House standards, for instance, were developed for residential design, but their principles of achieving a high level of airtightness and eliminating thermal bridges are equally applicable to commercial structures.

    The even more comprehensive Living Building Challenge requires buildings to produce more energy than they consume, and collect and treat all water on site."

    https://www.canadianarchitect.com/features/architectures-climate-crisis/

 
watchlist Created with Sketch. Add CPV (ASX) to my watchlist
(20min delay)
Last
24.0¢
Change
-0.015(5.88%)
Mkt cap ! $98.52M
Open High Low Value Volume
25.5¢ 26.0¢ 24.0¢ $120.7K 488.7K

Buyers (Bids)

No. Vol. Price($)
8 45490 24.0¢
 

Sellers (Offers)

Price($) Vol. No.
25.0¢ 6578 1
View Market Depth
Last trade - 16.10pm 15/11/2024 (20 minute delay) ?
CPV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.