NDO 0.67% 75.5¢ nido education limited

Oz, Today, tomorrow...to reach TD (when the next CP ann is due)...

  1. 6,106 Posts.
    lightbulb Created with Sketch. 18
    Oz,

    Today, tomorrow...to reach TD (when the next CP ann is due) is still ballpark, providing there have been no major holdups...I mentioned in another post what some of them could be at this stage of drilling.

    They also should've run a leak-off test just below the 9-5/8" casing shoe to test formation integrity and cement bonding (of the 9-5/8)...perhaps got held up here and needed to do a squeeze job or something.
    They are at the stage where maximum care has to be taken to avoid anything untoward, especially drilling into the top of a prognosed reservoir where gas may be present.

    We just have to be patient...and hope that the discovery gods are with us this time!!
 
watchlist Created with Sketch. Add NDO (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.